Electrical & Lighting Engine & Drivetrain Brakes, Suspension, & Steering Body Tire & Wheel Other Parts & Supplies Top Searches

HALDEX AL919350 ABS Electronic Control Unit - 12V A7, Long Lead Solenoid Cable

No Stock Available

We cannot fulfill orders for this part at this time. Please check back later or request a stock notification to receive an email.

We may have similar parts for sale. Search Alternatives >

HALDEX AL919350 Part Description

Manufacturer

HALDEX

Product Description

Electronic Control Unit

Application Summary

Trailer · ITCM · ITCM , ECU 12V A8, Long Lead Solenoid Cable

Features & Benefits

  • Meets the industry’s meticulous manufacturing standards to ensure consistent performance and quality
  • Built to withstand harsh operating conditions
  • Offers quick, trouble-free installation
  • Guaranteed to last for years to come

Haldex ITCM ECU

For your repair and maintenance needs, look no further than the Haldex ITCM ECU. Engineered by a brand with over 100 years of engineering expertise, this product is all you need to restore your anti-lock braking system’s performance.

HALDEX AL919350 Specifications

Product Attributes

Freight Class 70
Trailer Control Module Specifications 12V, A8

Additional Information

Country of Origin (Primary) MX
Harmonized Tariff Code (Schedule B) 8543709960
Harmonized Tariff Code (HTS) 8543709960
Remanufactured Part N
Warranty Distance 100000
Warranty Distance UOM MI
Warranty Special 36 MO, 200,000 MI=ABS - Antilock Braking Systems Including Haldex TRS (Valves, ECUs and Looms Only). 12 MO, 100,000 MI= All Other ABS - Antilock Braking Systems Components. See L20221W.pdf for warranty details
Warranty Time 12
Warranty Time UOM MO
UPC 00767653372730
VMRS Code 013011076

HALDEX AL919350 Part Interchanges

Brand Part Number
N/A AL919350

HALDEX AL919350 Manufacturer Information

Haldex® is a Sweden-based manufacturer specializing in brake and air suspension systems for heavy duty vehicles. Its product line consists of brake components for wheel ends, including disc brakes, brake adjusters, and actuators. It also offers air control products such as compressed air dryers, valves, ABS, and EBS. All these Haldex products are designed with safety and efficient operation in mind, cutting down on potential hazards and maintenance costs in the long run. Today, Haldex runs manufacturing and R&D facilities in 19 countries across four continents. It is dedicated to producing high-quality brake and suspension parts for its customers all around the world as well as developing new technologies for the future.
California Proposition 65 Warning California residents see

Recommended Products

More from HALDEX

(Browse all)